2000 New deck and ramp to lower pool was constructed under the direction of project coordinators Steve Schultheis and Dennis Inverso.
Purchased 3 new composite picnic tables with umbrellas for deck. 2002 Discontinued use of sign-in book and instituted membership cards with member’s pictures
2003 Original (vintage 1958) steel upper pool totally removed and reconstructed with plaster.
Pump house equipment replaced. Concrete around pool replaced along with perimeter drains. 2200 square feet of sod installed. New fence around pool installed under the direction of Steve Schultheis and Dennis Inverso. Fence removed between picnic area and baby pool. 2005 Removed cinder-block from center of pavilion by members and pool staff Installed new electrical poles, electrical substation, and manholes for easy access to buried cables. For safety reasons, relocated rusty electrical panel and motor starters from upper pump house to new substation. Installed a new chair rack by Dennis Inverso.
Moved the miniature golf and added another hole for the kids by Bob Marks. Added a fence to the front gate. Installed a new computer system for member check-in by Dennis Inverso. Moved all the grills to the perimeter of the picnic area for additional child safety.
Purchased a new volleyball net, which can be installed within minutes between the poles on the basketball court. Added wall ball structure on blacktop. 2006 Installed a new chair rack. Moved the miniature golf and added another hole for the kids. Added a fence to the front gate. Installed a new computer system for member check-in. 2007 Several trees were trimmed in the picnic area and the parking lot. The Bathhouse was completely repainted and the floors were power washed to remove the loose epoxy. Other projects included adding an amplifier and speakers for our intercom system by Dennis Inverso, and some extra landscaping in several areas. The baby pool and gutters on the upper pool received a fresh coat of paint before opening day. The storage area for chairs was improved, adding another rack and moving existing racks to allow more room.
In addition, a new Terrace/Pavers step was installed to replace the old wood steps in front of the pavilion under the direction of Rich Horan who also installed the concrete shuffleboard. These projects were completed by members to save the Club labor costs. 2008 Several projects were completed. The biggest project included refurbishing the floors in the restrooms and breezeway with a nonslip concrete surface.
Also, completed was the installation of a larger window for an improved view of the upper pools by Steve Amway, and implementing a recycling program. All blue doors repainted by members during the spring workday. 2009 New security cameras installed. All electrical outlets and circuits rewired. Check-in software updated. Starting blocks replaced. Pool drains replaced due to swimming pool code. Outside lights added to front of Club.